Jump to content

Search the Community

Showing results for tags 'far 36'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • Instructions and Terms of Use
    • Terms Of Use
    • Before You Register, Before You Post, Instructions for Writing Your Question
  • Contracting Forum
    • What Happened?
    • Polls
    • For Beginners Only
    • About The Regulations
    • COVID-19 And Its Effect on Contracting
    • Contracting Workforce
    • The Good, The Bad, the Ugly
    • Recommended Reading
    • Contract Award Process
    • Contract Pricing Including CAS & Allowable Costs
    • Contract Administration
    • Schedules, GWACS, MACs, IDIQs
    • Subcontracts & Subcontract Management
    • Small Business, Socioeconomic Programs
    • Proposed Law & Regulations; Legal Decisions

Blogs

  • The Wifcon Blog
  • Don Mansfield's Blog
  • Government Contracts Blog
  • Government Contracts Insights
  • Emptor Cautus' Blog
  • SmallGovCon.com
  • The Contractor's Perspective
  • Government Contracts Legal Forum
  • NIH NITAAC Blog
  • NIH NITAAC Blog

Product Groups

There are no results to display.

Categories

  • Rules & Tools
  • Legal Opinions
  • News

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


AIM


MSN


Website URL


ICQ


Yahoo


Jabber


Skype


Location


Interests

Found 2 results

  1. Is it permissible to award an 8(a) sole source single award AE IDIQ? FAR 36.101 appears to prevent such a contemplated award, as requirements exist within FAR Subpart 36.6 that may be challenging to meet under such an acquisition type. A Few Relevant References (Specific Areas of Interest Included as Blue Font): Subpart 36.1 - General 36.101 Applicability. (a) Construction and architect-engineer contracts are subject to the requirements in other parts of this regulation, which shall be followed when applicable. (b) When a requirement in this part is inconsistent with a requirement in another part of this regulation, this part 36 shall take precedence if the acquisition of construction or architect-engineer services is involved. 36.602 Selection of firms for architect-engineer contracts. 36.602-1 Selection criteria. (c) Hold discussions with at least three of the most highly qualified firms regarding concepts, the relative utility of alternative methods and feasible ways to prescribe the use of recovered materials and achieve waste reduction and energy-efficiency in facility design (see part 23). 36.602-3 Evaluation board functions. (c) Hold discussions with at least three of the most highly qualified firms regarding concepts and the relative utility of alternative methods of furnishing the required services. Your thoughts are most appreciated!
  2. Outside of an acquisition following Brooks Act procedures (40 U.S.C. 1101-1104), is there a permissible method for contracting for service contractors to perform on-site engineering reviews, construction phase inspections, preparation &/or review of As-Built drawings, or similar services? I view these items as “services of an architectural or engineering nature, or incidental services, that members of the architectural and engineering professions (and individuals in their employ) may logically or justifiably perform, including studies, investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services, soils engineering, drawing reviews, preparation of operating and maintenance manuals, and other related services." FAR 2.101; 40 U.S.C 1102(2)(C ). Accordingly, it is my position that they must be procured by qualifications based selection under the Brooks Act, FAR 36.602-1 and applicable agency FAR supplements. That said, I’ve noted some single award Indefinite-Delivery/Indefinite-Quantity Contracts (IDIQs) for services (that it has been suggested I use) where “engineering technicians” and “design & construction project managers” are acquired for in-house/on-site support via IDIQ Task Orders. On making inquiries with the PCOs for these contracts, they have acknowledged to me that their IDIQs were either competed under FAR 15, or were direct awards under the 8(a) program. Under both scenarios, I am also of the understanding that specific selection criteria from FAR 36.6 were not utilized, even in the case of the FAR 15 procurement’s tradeoff analysis. Additionally, if engineering related services are acquired to provide on-site government support (but not through the statutory authorization of the Brooks Act), does the government convert an otherwise authorized service acquisition into a contract for personal services under FAR 37.104? Any thoughts would be appreciated.
×
×
  • Create New...