- Sequence of conducting evaluation: Can you evaluate Price first and then Past Performance?
-
Sequence of conducting evaluation: Can you evaluate Price first and then Past Performance?
Say a solicitation contains a Past Performance Adjectival Rating Scale as follows: Excellent Good Fair No Confidence Neutral Say the solicitation is for a Fixed-Price contract, and the evaluation basis is Best Value (Tradeoff). Say there are only three evaluation factors: Technical Approach, Price, and Past Performance. Say the solicitation said that Price would be evaluated for Price Reasonableness. Assume the solicitation is silent on Price Realism Analysis (note, GAO has previously held that, if a solicitation for a fixed price contract is silent on whether a Price Realism Analysis will be performed, then the agency cannot conduct a Price Realism Analysis). EDITED on 7/15/2014 at 10:09 AM TO ADD THIS PARAGRAPH: Say further that, the solicitation puts offerors on notice of the evaluation process/sequence: that TECHNICAL will be evaluated first. If any proposals are found TECH UNACCEPTABLE, they will NOT be evaluated further. Only the technically acceptable proposals will move on to be evaluated for Price. Then, only the proposals with fair and reasonable price will move on to be evaluated for Past Performance. Based upon this fact pattern, would Past Performance be considered a "technical" factor, thereby requiring the agency to evaluate Past Performance before evaluating for Price? And therefore, if Offeror A's price was used to establish ADEQUATE PRICE COMPETITION in the Price Analysis, and then subsequently, Offeror A got a Past Performance Rating of NO CONFIDENCE, would the agency have to go back and redo the Price Analysis, this time leaving out Offeror A's price proposal/total price?
-
Sequence of conducting evaluation: Can you evaluate Price first and then Past Performance?
I, too, do not see anything in FAR Part 15 that explicitly, affirmatively requires an agency to evaluate proposals against certain Evaluation Criteria in a specific order or sequence. However, there are GAO decisions that imply that there is a specific order or sequence. For example, when a CO tries to evaluate for Price Reasonableness by using Adequate Price Competition, the GAO has held that a Technically Unacceptable proposal cannot be used to establish Price Reasonableness. Therefore, the proposals would have to be evaluated for Technical first, in order to know which proposals are Technically Unacceptable, and therefore could not be used in the Price Evaluation. So my real question is, would "Past Performance" be considered a "Technical" evaluation factor for this purpose, and therefore, the agency would be required to evaluate PP first, before going on to evaluate Price? Here is the GAO info: There is a GAO decision called “To Akin, Gump, Strauss, Hauer & Feld,” B-177847, Jul. 10, 1973 (a really old case), where the protester was Texas Instruments. The awardee was General Dynamics (GD). Here is the link: http://www.gao.gov/products/482465 TI argued that there was adequate price competition and should have won the award. GAO wrote: “For the following reasons, we agree with Government’s position that adequate price competition did not exist in the circumstances. The clear import of the TEP report is that GD’s initial proposal was technically unacceptable . . . Since only one offeror, TI, submitted a fully acceptable offer, the criteria of adequate price competition set forth in FPR 1-3.807-1( (1) . . . .at least two responsible offerors who can me the Government’s requirements – were not met.” Well, the FPR no longer exists. But the exact same language appears in the FAR as follows: FAR 15.403-1(c )(1) defines “Adequate Price Competition” as existing when “Two or more responsible offerors . . . submit priced offers that satisfy the Government’s expressed requirement . . .” AND in Lifecycle Construction Service, LLC, B-406907, Sep. 27, 2012, GAO said: While the CO and the source selection official assert that the median represented the “fair market pricing,” they also acknowledge that three of the price coefficietns used to establish that benchmark were, themselves,sunreasonably high, and several others were proposd by offeros/proposal that were determined to be unacceptable or ineligible for award. Accordingly, in our view, the median could not reasonably be relied upon as a valid benchmark for comparison.”
-
Sequence of conducting evaluation: Can you evaluate Price first and then Past Performance?
I believe that an agency can evaluate Price first, and the Past Performance, as long as the solicitation announced that this is what the agency intends to do. A colleague asked, But how can we establish Price Reasonableness if we don't know an offeror's Past Performance? What happens if, Offeror A is found to have a Reasonable Price, and then the Past Performance evaluation reveals that Offeror A has Unacceptable Past Performance?
-
Dash 8 Clause (FAR 52.217-8) and Major Contracting Services GAO decision
I agree with Vern that the GAO got it wrong in Major Contracting Services. While we are waiting and hoping that the FAR Council will take action to amend the FAR, though, most agencies are likely to just do whatever they have to in order to avoid GAO protests. Very few will have the chutzpah to tell GAO to get lost. So how can we work with the present conditions we have? I searched FBO for example solicitation language. Here are ones that I found. Thoughts? EXAMPLES FROM FBO U.S. Army Solicitation for Document Destruction Services Solicitation Number: W912D0-14-T-0001 https://www.fbo.gov/index?s=opportunity&mode=form&tab=core&id=96f5a147e4d1afc238359a2372647b84 "Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are mathematically and materially unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s). As part of price evaluation, the government will evaluate its option to extend services (see FAR Clause 52.217-8) by adding one-half of the offeror's final option period prices to the offeror's total price. Thus, the offeror's total price for the purpose of evaluation will include the base period, 1st option, 2nd option, 3rd option, 4th option, and 1/2 of the 4th option. As indicated in FAR 52.217-8 the government will have the option provision to extend the performance of the contract up to an additional 6 months when the contractor is provided written notice. Providing pricing for the optional six-month extension period is not required." AND Federal Election Commission IT Gap Analysis and Inventory Survey Services Solicitation Number: FE-14-R-003 https://www.fbo.gov/?s=opportunity&mode=form&id=477656340ce3f5353578d74cb8b6a9ca&tab=core&_cview=0 "Evaluation of Option to Extend Services under 52.217-8. For the purposes of the award of this Contract, the Government intends to evaluate the option to extend services, provided under FAR 52.217-8, as follows: The evaluation will consider the possibility that the option can be exercised at any time, and can be exercised in increments of one to six months, but for no more than a total of six months during the life of the contract. The evaluation will assume that the prices for any option exercised under FAR 52.217-8 will be at the same rates as those in effect under the contract. The evaluation will therefore assume that the addition of the price or prices of any possible extension or extensions under FAR 52.217-8 to the total price for the basic requirement and the total price for the priced options has the same effect on the total price of all proposals relative to each other, and will not affect the ranking of proposals based on price, unless, after reviewing the proposals, the Government determines that there is a basis for finding otherwise. This evaluation will not obligate the Government to exercise any option under FAR 52.217-8."
-
Dash 8 Clause (FAR 52.217-8) and Major Contracting Services GAO decision
As many of us know, GAO stated in Major Contracting Services, B-401472, that agencies must EITHER evaluate for exercise of the Dash 8 Clause (FAR 52.217-8) at award OR do a sole-source justification/evaluate price when the time comes and they decide to exercise it. If an agency wants to do the former, meaning, the agency wants to try to evaluate for exercise of the Dash 8 Clause at award, how would the agency do that? Is the CO supposed to add the price of the Dash 8 Clause to the price of the Option Years and the Base Period to get the "Total Price"? Look at FAR 52.217-5, Evaluation of Options clause. It states: FAR 52.215-5, Evaluation of Options Evaluation of Options (July 1990) Except when it is determined in accordance with FAR 17.206( B ) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). Here is the link the Major Contracting Services decision: B401472 Major Contracting Services http://www.gao.gov/d...dpro/401472.htm
-
FAR 15.503 Preaward Notices - Notice to unsuccessful offerors
The Nash and Cibinic Formation of Government Contracts book states on p. 958 (I have a really old edition, so newer editions may have a different starting page number): SELECTION, AWARD, NOTICES AND DEBRIEFINGS SECTION E. NOTICES AND DEBRIEFINGS "Although the procurement statutes do not specifically state that Preaward Notices of exclusion from the competition is to be given, the requirement for such notice is implicit in the offeror's right to request a Preaward Debriefing . . ."
-
FAR 15.503 Preaward Notices - Notice to unsuccessful offerors
Is the CO required to "promptly" send Preaward Notices to offerors whose proposals were deemed "non-conforming" if no Competitive Range will be established? And what does "promptly" mean? SCENARIO: The CO received a bunch of proposals. Say 30 proposals. 10 of the proposals violate say, the page limitations from the solicitation. The solicitation specifically warned, hey, if you submit a proposal that does not conform to ALL of the Section L instructions, then it "may" be kicked out. Say the CO here believes these non-conforming proposals should be kicked out. Now, does the CO have to send the Preaward Notices to these 10 offerors immediately, or can the CO wait until the evaluations are totally done, and just notify the offerors then? FAR 15.503 Notifications to unsuccessful offerors. (a) Preaward notices— (1) Preaward notices of exclusion from competitive range. The contracting officer shall notify offerors promptly in writing when their proposals are excluded from the competitive range or otherwise eliminated from the competition. The notice shall state the basis for the determination and that a proposal revision will not be considered. (2) Preaward notices for small business programs. (i) In addition to the notice in paragraph (a)(1) of this section, the contracting officer shall notify each offeror in writing prior to award, upon completion of negotiations, determinations of responsibility, and, if necessary, the process in 19.304(d)— (A) When using a small business set-aside (see Subpart 19.5); (B ) When a small disadvantaged business concern receives a benefit based on its disadvantaged status (see Subpart 19.11 and 19.1202) and is the apparently successful offeror; (C ) When using the HUBZone procedures in 19.1305 or 19.1307; (D) When using the service-disabled veteran-owned small business procedures in 19.1405; or (E) When using the Woman-Owned Small Business Program procedures in 19.1505. (ii) The notice shall state— (A) The name and address of the apparently successful offeror; (B ) That the Government will not consider subsequent revisions of the offeror’s proposal; and (C ) That no response is required unless a basis exists to challenge the size status or small business status of the apparently successful offeror (e.g., small business concern, small disadvantaged business concern, HUBZone small business concern, service-disabled veteran-owned small business concern, economically disadvantaged women-owned small business concern, or women-owned small business concern eligible under the Women-Owned Small Business Program). (iii) The notice is not required when the contracting officer determines in writing that the urgency of the requirement necessitates award without delay or when the contract is entered into under the 8(a) program (see 19.805-2).
-
FAR 19.1202-2, must agency evaluate for "extent of participation" in Partial Set-Asides?
Thanks. I found the DOD memo on the Class Deviation from 2010 online: http://www.acq.osd.mil/dpap/policy/policyvault/Class%20Deviation%202011-O0003%20-%20Signed.pdf I also looked at the Proposed Rule from September 2011 from FAR Case 2009-016 that Vern mentioned: [Federal Register Volume 76, Number 175 (Friday, September 9, 2011)] http://www.gpo.gov/fdsys/pkg/FR-2011-09-09/html/2011-22944.htm It says that not everything is necessarily eliminated. It might be, but it's not sure: "Paragraph A. FAR Revisions ... With respect to FAR 19.1202, Evaluation factor or subfactor, FAR subpart 19.7 is currently silent on its use. Nothing in this rulemaking precludes an agency from using evaluation factors and subfactors for subcontracting during source selections. The [sBA] regulations (13 CFR 125.3(g0) allow the application of evaluation factors and subfactors to subcontracting with any of the small business programs, including, but not limited to, SDBs. The FAR Council will confer with SBA to evaluate the need for guidance in the FAR on the use of evaluation factors and subfactors for subcontracting." So it looks like it is not mandatory to evaluate the "extent of participation" anymore, but it is not precluded either. Also, I find it interesting that not all agencies issued Class Deviations after the Rothe decision. DOD did, and so did NASA. Here is NASA's Class Deviation from FAR 19.12 issued in 2011: http://www.hq.nasa.gov/office/procurement/regs/pic11-01.html I don't work for DHS, but just out of curiosity, I search to see if DHS had issued a Class Deviation. I couldn't find one.
-
FAR 19.1202-2, must agency evaluate for "extent of participation" in Partial Set-Asides?
At FAR 19.1202-2(a), it states that agencies must evaluate "the extent of participation of SDB concerns in performance of the contract" in competitive, negotiated acquisitions that are expected to exceed $650,000. But then it lists several "exceptions" in subparagraph (B ) that include "Small business set-asides." QUESTION: What about partial small business set-asides? The FAR does not specify whether agencies must evaluate for this in partial small business set-asides. My gut instinct is, if it is partial, then only the portion that is "unrestricted" and open to large business must be evaluated for "the extent of participation of SDB concerns . . ." However, others disagree with me. They say, if it is partial, then the agency is NOT supposed to evaluate for this for ANY vendor, even the large businesses. Thoughts? Here is an excerpt of FAR 19.1202-2 set forth: FAR 19.1202-2 Applicability. (a) Except as provided in paragraph (B ) of this subsection, the extent of participation of SDB concerns in performance of the contract in the authorized NAICS Industry Subsector shall be evaluated in competitive, negotiated acquisitions expected to exceed $650,000 ($1.5 million for construction). (B ) The extent of participation of SDB concerns in performance of the contract in the authorized NAICS Industry Subsector (see paragraph (a) of this subsection) shall not be evaluated in- (1) Small business set-asides . . .
-
Copyright Infringement
I was reading FAR 52.227-14, Rights in Data - General, and found that it contains this provision that I think should cover copyright infringement: FAR 52.227-14© Copyright, at paragraph (2) says, "Data not first produced in the performance of this contract." It states, The Contractor shall NOT, without the prior written permission of the CO, incorporate in data delivered under this contract any data not first produced in the performance of this contract unless the Contractor Identifies the data AND obtains a license for the Gov't to use the data. In paragraph (a) of this clause, it defines "data" as "means recorded information, regardless of form or the media on which it may be recorded." Thoughts?
-
Copyright Infringement
I just found this thread, and I agree with, wvanpup, it is very strange that the FAR does not seem to have a comparable clause for Copyright Infringement as it already has for Patent Infringement (FAR 52.227-1, Authorization and Consent). Why is this?
- Does a QASP have to be included in the solicitation?
-
Does a QASP have to be included in the solicitation?
It doesn't matter what is in my particular QASP. As I explained in #22, I believe I understand now what Vern considers as the type of information that is usually found in a QASP that must go into the solicitation and contract, versus the type of information that is usually found in a QASP that DOES NOT go into the solicitation and contract. Thanks everyone!
-
Does a QASP have to be included in the solicitation?
To joel Hoffman post #18: Ok, yes, I see from the example QASPs you provided how it would be awkward to include the QASP in the solicitation/contract. Perhaps the entire PBSC QASP format is messed up and needs revision in the FAR. What is challenging and frustrating is that, some of the info typically in QASPs (e.g., the testing method like random sampling, the frequency of testing/sampling, what constitutes "passing" the test or what the standards are, etc.) must go into the solicitation so the KTR can take that stuff into account when formulating its proposal. But then there is this other stuff, like the checklist tracking that you showed in your example QASPs, that obviously is not logical to include in the solicitation as it is a "living document" as you say. Then what happens is that some agency contracting professionals put ALL of the info described into the QASP, then don't put the QASP into the solicitation because they believe the FAR doesn't explicitly say, the QASP must be included. I wish they would read Vern's blog post "Think! (maybe)." What needs to be done is for contracting professionals to go over the QASP with a fine-tooth comb and pick out the necessary info to share with the offerors/contractors, such as the testing method of random sampling etc., and put that into the solicitation.
- Does a QASP have to be included in the solicitation?
-
Does a QASP have to be included in the solicitation?
See, this makes me think of the Performance Requirements Summary (PRS). In my own experience, the QASP and PRS are so closely intertwined that they are created/drafted together at the same time. And as it says in FAR 46.401, the QASP "should" be prepared in conjunction with the SOW. So that leads me to conclude that the PRS, which usually contains the objective, measurable standards for a PBSC, and those often involve the sampling method, must also be drafted in conjunction with the SOW. The PRS often appears in Section C, SOW. SO the PRS is part of the SOW anyways. But how can the agency figure out the PRS chart if it hasn't first hashed out its QASP? So that is making me believe the QASP and PRS, both of them, have to be done when the SOW is drafted. And if the solicitation has the PRS in Section C, the SOW, but no correlating QASP included, how can the GOVT, assuming it somehow failed to create the QASP "in conjunction" with the SOW like it is supposed to, suddenly create the QASP post-award, and still have it compatible with the PRS, which is already "set in stone" in the awarded contract? I know the contract could be modified later, but still, it doesn't make sense . . .
-
Does a QASP have to be included in the solicitation?
FAR 37.604 addresses "Quality Assurance Surveillance Plans." In other words, QASPs. But it does not define QASP. All it says is, the reader must look to FAR Subpart 46.4 for "Requirements" for QASPs. So we go to FAR 46.4. Wait, first let's look at definitions in FAR 46.1. FAR Part 46 is all about "Quality Assurance." At FAR 46.10, Definitions, it defines "Government contract quality assurance" as "means the various functions, including inspection, performed by the Government to determine whether a contractor has fulfilled the contract obligations pertaining to quality and quantity." FAR 46.101 further defines "Testing" as a component of "inspection that determines the properties or elements." Now we go to FAR 46.4, Government Contract Quality Assurance. At FAR 46.401, it says QASPS "should be prepared in conjunction with the preparation of the SOW.," and that the QASP "should" specify all work requiring surveillance, and "the method of surveillance." So there is no express definition of QASP, but it looks like we can infer that QASPs involve inspection of the KTR's work, and that inspection can involve testing the KTR's work.
-
Does a QASP have to be included in the solicitation?
I'm not seeing how to reconcile the no-QASP-required-in-the-solicitation-or-contract position with the following BCA decisions: In Tester Corp., ASBCA 21312, 78-2 BCA P 13,373, the board held that, if the GOVT changes the test method for inspection, it must inform the KTR of what test results are to be met under the new test. In Pinay Flooring Prods., Inc., GSBCA 9286, 91-2 BCA P 23,682, the board held that, after years of allowing testing to be done a certain way, the GOVT was not entitled to change the test method without giving notice to the KTR. If the GOVT has a duty to give advance notice to a KTR of changes to "test results" standards and changes to the "test method," doesn't it follow that the GOVT has a duty at the beginning of a contract, to give notice to the KTR of what the original test results/test method will be? And isn't the "test method" also known as the "QASP" in performance-based service contracts? So therefore, the QASP must be provided to the KTR prior to the start of performance? In fact, since it could affect how they craft their technical approach, their entire proposal, both technical and cost/price, etc., doesn't the GOVT have a duty to provide the QASP to the KTR in the solicitation stage?
-
Does a QASP have to be included in the solicitation?
What about FAR 37.601 (b ) (2), which states: Performance-based contracts for services shall include . . . .Measurable performance standards (i.e., in terms of quality, timeliness, quantity, etc.) and the method of assessing contractor performance against performance standards . . . " Wouldn't the QASP qualify as "the method of assessing contractor performance against performance standards"? Ergo, the contract, only if it is "performance-based," must include the QASP? Thoughts?
-
Does a QASP have to be included in the solicitation?
QUESTION: Does a QASP have to be included in the solicitation? I ask this because an experienced CO with more than two decades under his belt told me that there is no requirement in the FAR or anywhere else for the CO to include the QASP in the solicitation or in the awarded contract. I find this strange. So I was looking in Nash and Cibinic's "Contract Administration" book on the chapter on Quality Assurance/Inspection. They cited FAR 46.201. BTW, FAR PART 46 is all about "Quality Assurance" in general. At FAR 46.201(a), Contract Quality Requirements, it states, "The CO SHALL include in the solicitation and contract the appropriate quality requirements. The type and extent of contract quality requirements needed depends on the particular acquisition and may range from INSPECTION AT TIME OF ACCEPTANCE to a requirement for the contractor's implementation of a comprehensive program for controlling quality . . . " Would a QASP meet the definition of "the appropriate quality requirements" as used in FAR 46.201? If so, doesn't that mean then, that FAR 46.201 is saying the QASP shall be "included" in the solicitation/contract?
- How can a fixed-price contract contain "incentives" on its PRS?
-
How can a fixed-price contract contain "incentives" on its PRS?
InNeedofWisdom: Thanks, I did not notice that in FAR 16.202-1 before. If an agency has a contract that is FFP and also has a Performance Requirements Summary (PRS) that contains a column with Incentives and Disincentives, and the incentives are NOT based on cost, say they are based on the contractor performing the contract to a certain standard, or exceeding a certain standard, such as resolving 99% of helpdesk calls within 24 hours, can the "incentive" be a monetary incentive, like X dollars given to the contractor, or X amount of percentage of the contract price given to the contractor? If it can be monetary, then how is the contract still FFP?
- How can a fixed-price contract contain "incentives" on its PRS?