52.244-2 Consent for subcontracts over SAT (cumulative vs. transaction)

Greetings: I am seeking guidance from the community on this issue. Any assistance you can provide would be appreciated. Background: The prime contract includes FAR 52.244-2 with para (d) modified as follows: (d) If the Contractor has an approved purchasing system, the Contractor nevertheless shall obtain the Contracting Officer’s written consent before placing the following subcontracts: Notwithstanding the language contained in paragraph ©, written consent from the Contracting Officer is
@here_2_help I agree with everything in your second post. Thanks for that. @ji20874 My position has always been that consent for the 15K mod in the original post would not be required. The term "subcontract" as used in the clause includes modifications, and because the 15K mod (subcontract) does not exceed the SAT, no consent is required. I asked about here_2_help's response because it appeared not to consider the mod as a subcontract, but since that has been amended or clarified, we are a