October 14Oct 14 comment_99850 This is the decision for reconsideration. I think GAO just lost patience with the protester. These excerpts from the decision.https://www.gao.gov/products/b-424245.3Most of Cashel's allegations attempt to prove an elaborate, byzantine conspiracy executed by a third-party advisory firm to steer the contract to Centinel. Protest at 50-58.(“This conspiracy is a distraction from the fundamental truth that this Offeror was just not competitive. The Protester was not chosen because the Agency found its proposal deficient in many aspects, which resulted in the Protester being ranked fifth out of five offerors. The Protester's proposal can be summarized as a low‑effort proposal that featured double the fees of its competitors and an AI-generated hotel floor plan[] which may or not have placed a toilet inside the kitchen.”) Report
Tuesday at 02:01 AM3 days comment_99937 That floor plan line is going to show up in proposal training for years. What strikes me is that the AI image wasn't why they lost. Fifth of five with double the fees would have been enough. Still, it's a useful reminder for offerors that evaluators do look at the graphics. A generated image that nobody on the team checked tells the evaluator exactly how much review the rest of the proposal got. Report
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.