Posted July 10, 20241 yr comment_85296 Experts, We are currently performing under a DoD CPFF research contract. I would like to award a FFP subcontract to perform a study for us, which ideally would be over a 9 month period. However, the CPFF contract is intermittently funded, and at the time of placing the FFP subcontract, we would not have the funds for the full 9 months. Thinking outside of the box (but still within the FAR), how could I do this? Could I do it in three month periods, with two additional options? Each period would have a final report deliverable. Perhaps I could award a FFP-LOE with subclins, however I do want to avoid the impression that I'm essentially faking a T&M subcontract. Our contract does have FAR 52.244-2 Subcontracts (2020), and with regards to (c)(2)(I), the overall value would be less than 5% of the total cost of the contract.
July 10, 20241 yr comment_85297 Break the study into logical phases. Award a contract for the first phase that includes priced options for each of the subsequent phases. Coordinate the conduct of each phase with your CPFF contract funding schedule. Require submission of a results/status report at the end of each phase.
July 11, 20241 yr comment_85312 22 hours ago, DE13151719 said: the CPFF contract is intermittently funded, What does this mean? Is the contract an indefinite delivery contract or is it incrementally funded or something else?
July 19, 2024Jul 19 Author comment_85444 Retreadfed, yes I mispoke. I wrote intermittently funded when I meant incrementally funded.
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.