[Federal Register: November 23, 2007 (Volume 72, Number 225)]
[Rules and Regulations]
[Page 65868-65873]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr23no07-12]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
GENERAL SERVICES ADMINISTRATION
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
48 CFR Parts 2, 22, 23, 36, and 52
[FAC 2005-22; FAR Case 2006-008; Item I; Docket 2006-020; Sequence 12]
RIN 9000-AK63
Federal Acquisition Regulation; FAR Case 2006-008, Implementation
of Section 104 of the Energy Policy Act of 2005
AGENCIES: Department of Defense (DoD), General Services Administration
(GSA), and National Aeronautics and Space Administration (NASA).
ACTION: Final rule.
-----------------------------------------------------------------------
[[Page 65869]]
SUMMARY: The Civilian Agency Acquisition Council and the Defense
Acquisition Regulations Council (Councils) have agreed on a final rule
amending the Federal Acquisition Regulation (FAR) to address
implementation of Section 104 of the Energy Policy Act of 2005.
DATES: Effective Date: December 24, 2007.
FOR FURTHER INFORMATION CONTACT: Mr. William Clark, Procurement
Analyst, at (202) 219-1813 for clarification of content. For
information pertaining to status or publication schedules, contact the
FAR Secretariat at (202) 501-4755. Please cite FAC 2005-22, FAR case
2006-008.
SUPPLEMENTARY INFORMATION:
A. Background
DoD, GSA, and NASA published a proposed rule in the Federal
Register at 71 FR 70937, December 7, 2006. The rule proposed to amend
FAR Parts 23, 36, and 52 to ensure compliance with the Federal mandate
to promote energy efficiency when specifying or acquiring energy-
consuming products. This mandate stems from Section 104 of the Energy
Policy Act of 2005. Section 104 requires that all acquisitions of
energy consuming-products and all contracts that involve the furnishing
of energy-consuming products require acquisition of ENERGY STAR[reg] or
Federal Energy Management Program (FEMP) designated products.
On February 5, 2007, the public comment period closed. Seven
respondents submitted comments on the proposed rule (3 associations/
coalitions, 3 Government agencies or offices, and 1 Government
employee).
1. Voice positive support for the clause.
Comment: Three respondents all voice positive support for the
proposed clause at FAR 52.223-15, Energy Efficiency in Energy-Consuming
Products. One respondent states that adding the clause will make ENERGY
STAR[reg]/Federal Energy Management Program (FEMP)-designated products
an enforceable part of contracts, which will make it easier to comply
with the environmentally friendly purchasing regulations. Another
respondent states that it supports the proposal as written. This
respondent notes in particular that it is important to have a contract
clause for ENERGY STAR[reg] and FEMP-designated products. A third
respondent supports the draft FAR clause implementing the Energy Act of
2005, because this will promote the overall goal to proactively develop
programs to reduce the environmental impacts of industries'
manufacturing processes and products throughout their entire life
cycle.
Response: None required.
2. Recommend deletion of clause.
Comment: Although one respondent fully supports the policy of
promoting the acquisition of energy-efficient products by both the
Federal Government and commercial buyers, the respondent believes that
the new mandatory FAR clause would place an unnecessary and
unreasonable burden on contractors. According to this respondent, the
Energy Policy Act suggests that the procuring agency should bear the
burden of making sure that it buys an ENERGY STAR[reg] or FEMP-
designated product when such a product is available and cost-effective.
This approach has been effective. The proposed rule does not explain
why it is now necessary to change this approach, other than the
statement that ``agencies often overlook including the pre-existing
requirements in FAR 23.203 in contract specifications.'' The respondent
states three reasons why shifting the burden of compliance to the
contractor is a heavy risk.
ENERGY STAR[reg] compliance is not guaranteed for the life
of the product model. If new standards come out, the product may lose
its ENERGY STAR[reg] compliance and must remove the label. The producer
(or reseller) could no longer provide the product to the Government
under any contract that included the proposed clause.
Whether a product is compliant with the ENERGY STAR[reg]
qualifications can change after the Government takes possession.
Procuring agencies often modify products delivered by contractors,
transforming a product that was compliant into one that does not meet
the qualifications. The potential impacts of the proposed rule would be
amplified for Federal Supply Schedule (FSS) vendors who deliver
products to the Government under delivery orders. Through enhancements
of the buying agency, the product might be changed in such a way that
it no longer meets the ENERGY STAR[reg] standards.
An agency generally will not be in a position to determine
if an ENERGY STAR[reg] or FEMP-designated product is available or life-
cycle cost-effective until it makes its source selection decision.
Putting the proposed clause in solicitations would discourage all
potential offerors whose products are not ENERGY STAR[reg] or FEMP-
designated to forego the competition. Therefore, the respondent
suggests that at least the clause should not be included in
solicitations.
Response: The Councils do not agree that including a clause causes
an unreasonable burden on contractors. It is no more burden than
including the requirement in the specifications. The rationale provided
in the Federal Register notice that agencies are neglecting to include
the requirement in the specifications provides adequate rationale for
the need for a clause. In response to the three reasons to delete the
clause offered by the respondent--
The Councils agree that some change in wording may help
clarify that it is not the intent of the clause to require changes
after contract award. If the product is ENERGY STAR[reg] compliant or a
FEMP-designated product at the time of contract award, then delivery or
furnishing of that product will be acceptable for the life of the
contract (see change at 52.223-15(b)).
Any change to a product after the Government takes
possession would have no impact on the contractor. The contractor has
fulfilled its obligation upon delivery. Ordering activities should not
be placing orders for products on the Federal Supply Schedules that are
modified in such a way that the product no longer meets ENERGY
STAR[reg] Standards. In such circumstances, the agency should award a
contract, without the clause at 52.223-15, rather than ordering off the
schedule.
The third reason appears to apply to delivery of compliant
end products. It is necessary to include the clause in the
solicitation, so that offerors know the expectations of the agency. The
agency should do market research in advance of the solicitation, to
determine whether ENERGY STAR[reg] or FEMP-designated products are
available that meet the agency needs and are cost-effective over the
life of the product, so that the clause is not included if the agency
can determine in advance that an exception applies. If the clause is
included in the solicitation, it includes language that the requirement
may be waived by the contracting officer. Therefore, there is no
prohibition against an offer of noncompliant products, but the
Government is not encouraging submission of such offers. If the
contracting officer determines after receipt of offers that no
compliant products are available that meet the agency needs and are
cost-effective over the life of the product, then it may be appropriate
to amend the solicitation, and the clause need not be included in the
contract.
3. Approval level for exemptions.
Comment: One respondent thinks that ``agency head'' is too high an
approval authority for the exemptions at 23.205
[[Page 65870]]
in the proposed rule. (Note: The Councils have renumbered section
23.205 as 23.204 in the final rule.) The respondent recommends changing
to ``agency head or his/her designee'' or ``head of the contracting
activity.''
Response: According to FAR drafting conventions, the phrase ``or
designee'' should not be used in the FAR. FAR 1.108(b) states that each
authority is delegable unless specifically stated otherwise (see 1.102-
4(b)).
4. Exemptions at 23.205 do not match exemptions in paragraph (c) of
the clause.
Comment: One respondent recommends that the exceptions as proposed
in paragraph (c) of the clause should be the same as stated in the
proposed text at 23.205.
Response: The proposed FAR 23.205 is entitled, ``Procurement
Exemptions'' and goes on to describe two circumstances in which an
agency is not required to procure ENERGY STAR[reg] qualified or FEMP-
designated products: namely, if the head of the agency determines in
writing either that no qualified or designated product is reasonably
available that meets the agency's functional requirements, or that no
qualified or designated product is cost-effective over the life of the
contract. If the agency head makes either of these written
determinations, the proposed clause at FAR 52.223-15 never appears in
the solicitation. As such, the solicitation would be consistent with
the policies defined in the proposed FAR 23.205.
Even if the head of the agency does not make the written
determinations before issuance of the solicitation, and the clause does
appear in the solicitation, there is no apparent inconsistency. The key
issue with regard to the difference between the statement of the
exemptions at 23.205 and in the clause at paragraph (c) is that the
proposed text at 23.205 is addressed to the agency and the clause is
addressed to the contractor. FAR 23.205 provides criteria for the
agency to determine that use of the clause is not required. However, if
the clause is included in the solicitation/contract, the contractor can
determine whether ENERGY STAR[reg] or FEMP-designated products are
listed, but only the contracting officer could provide the
determination whether listed products meet the needs of the agency or
whether such products would be cost effective over the life of the
product. Therefore, the contractor must rely on written approval from
the contracting officer for these exemptions.
5. Object to proposed statement that exemptions should be rare (FAR
23.205(b)).
Comment: Three respondents object to the statement at FAR 23.205(b)
that it should be rare for a determination to be made that no ENERGY
STAR[reg] or FEMP-designated product is cost-effective over the life of
the product taking energy cost savings into account. They recommend
deletion of the language for the following reasons:
The language is overly broad and a blanket declaration
that a determination ``should be rare'' is not supported. Depending on
the product, it could be common that extra costs for an ENERGY
STAR[reg] product are not justified by the energy cost savings. The
qualifying specifications for a product to be considered as an ENERGY
STAR[reg] or FEMP-designated product are ever evolving. The periodic
update of the specifications may mean that products considered to be
energy-efficient today may not be eligible for the ENERGY STAR[reg]
label when the updated specification is introduced. Therefore, it
doesn't make sense to limit the use of the life-cycle cost exception by
claiming that the determination should be rare.
The statement lacks statutory basis.
The language is unnecessary and will discourage agencies
from waiving the requirement to purchase an ENERGY STAR[reg] product--
even when procuring such a product would not be life-cycle cost-
effective.
Response: The Councils agree that the statement ``Such
determinations should be rare as such products are normally life cycle
cost effective'' may be presumptuous in that the accuracy of the
statement is dependent on the product in question and various governing
label standards. The intent of the statement was to state a
probability, not impose a condition on agency heads. Product life-cycle
cost effectiveness is considered by the Department of Energy and the
Environmental Protection Agency in the process of identifying ENERGY
STAR[reg] or FEMP-designated performance levels. ENERGY STAR[reg]-
qualified and FEMP-designated products are assumed to be life-cycle
cost-effective under typical operating conditions and energy prices.
The agency head may waive the requirements if the agency head
determines that no ENERGY STAR[reg] or FEMP-designated product is cost
effective over the life of the product, regardless of the number of
such waivers already granted. The Councils have deleted the language
that was proposed at 23.205(b).
6. Impact on small business.
Comment: One respondent suggests that the statement at 23.205(b)
that exemptions for life-cycle cost should be rare (see previous
Section A.5.) has a particularly negative impact on small businesses,
which do not have the resources comparable to large businesses to
devote to developing new energy efficient technologies. According to
this respondent, small businesses are at a competitive disadvantage and
less likely to obtain the ENERGY STAR[reg] label. The respondent
concludes that such businesses will therefore be more reliant on the
exceptions in the Energy Policy Act. The respondent recommends that the
Councils revisit the conclusion that the proposed rule will not have a
significant impact on small businesses and delete the unnecessary
language proposed at FAR 23.205(b).
Response: As discussed in the previous section A.5., the Councils
have agreed to delete the proposed language that exemptions for life-
cycle cost should be rare.
Furthermore, the proposed rule does not change the requirements to
obtain the ENERGY STAR[reg] label. The criteria of obtaining the ENERGY
STAR[reg] label apply equally to small and large businesses. The
respondent offers no evidence that small businesses are unable to
obtain the ENERGY STAR[reg] label. Comments on the ability of a small
business to obtain the ENERGY STAR[reg] label should be addressed to
the EPA and the Department of Energy and are outside the parameters of
this rule. Therefore, the Councils re-affirm the statement in the
preamble to the proposed rule, that the rule is not expected to
significantly impact small businesses because the rule only emphasizes
existing requirements. See also Section B., Regulatory Flexibility
Analysis.
7. Clarify that prescription applies even if Government does not
take title.
Comment: One respondent suggests clarifying the proposed FAR
23.207(b) to indicate that products furnished by contractors while
performing at a Federally-controlled facility must meet the ENERGY
STAR[reg]/FEMP requirements regardless of whether the Government
receives title at the end of contract performance.
Response: The Councils did not agree to any change to the proposed
rule in response to this comment. Since no exclusions are listed, all
energy consuming products furnished by a contractor at a Government
facility are covered by the rule, whether or not the Government takes
title. FAR 23.207(b) (now 23.206(b)) already makes it clear that we are
not just applying the rule to
[[Page 65871]]
end products delivered by the Contractor and accepted by the
Government.
8. Consistency of language between clause prescription, 52.213-
4(b), and paragraph (b) of the clause.
Comment: One respondent points out that the clause prescription
does not match the paragraph (b) of the clause 52.223-15. The
respondent recommends changes to the clause as follows:
(b)(1)--Change ``Delivered'' to ``Delivered by the
contractor''.
(b)(3) and (4)--Combine into one paragraph to read
``Specified in the design construction, renovation or maintenance of a
facility, including any article, material, or supply to be incorporated
into the facility or work, regardless of whether the designs, plans, or
specifications utilized have been prepared by an architect-engineer.''
Response: The Councils reviewed the proposed language at 23.207,
52.213-4(b)(1)(viii) (which duplicates 23.207), and 52.223-15(b), and
agreed to make the language consistent in the prescription and clauses.
The Councils concluded that the statement ``delivered'' was
sufficient and not ambiguous. When discussing contractual requirements,
``delivered'' always applies to the contractor (or its subcontractors).
Although a requirement for the contractor to deliver a particular item
legally would require the contractor to ensure that any item delivered
by a subcontractor met the same requirements, the Councils have added
in paragraph (c) of the clause that the requirements of paragraph (b)
apply to the contractor (including any subcontractors).
The Councils did not agree to any change to the phrase ``furnished
by the contractor.'' There was no substantive inconsistency here
between text and clause, and the term ``furnished'' could imply
``furnished by the Government'' as Government-furnished property, so
including the term ``by the contractor'' makes it unambiguous. The
Councils added language to include products ``acquired by the
contractor for use in performing services at a Federally-controlled
facility'' and products ``furnished by the contractor for use by the
Government.''
The Councils agreed to change prescription, 52.213-4, and
paragraphs (b)(3) and (4) of the clause to clarify that ``specified''
applies to the design phase, and ``incorporation'' applies to the phase
of construction, renovation, or maintenance. In addition, the word
``building or work'' is substituted for facility, because it is a
defined term, used currently with regard to construction in Parts 22
and 25. The definition of this term has been moved from 22.4 to Part 2,
because it is used in more than one FAR part.
9. Rule should cover other energy savings.
Comment: One respondent recommends that the rule should be expanded
to cover water conserving products and low standby power. Although the
respondent recognizes that these issues could be addressed in another
FAR case at a later time, the respondent points out advantages of
combining these new ideas in this case, because of similarity of
purpose and urgency of achieving energy efficiency more quickly.
Response: The underlying rationale for the current FAR case is
implementation of Section 104 of the Energy Policy Act. Section 104 of
the Act makes no mention of low standby power or water efficiency and
such coverage is outside the scope of this case.
However, in considering whether such coverage would be necessary or
desirable, the Councils have determined that low standby power is one
of the FEMP energy attributes and is already included at FAR 23.203.
Low standby power is addressed separately at FAR 23.203 because there
is a separate Executive order related to low standby power. However,
separate mention in the clause is unnecessary. If acquiring a product
that has standby power requirements, one would be expected to deliver,
furnish, or specify a product meeting the FEMP designation.
Water efficient products are also covered to some extent by FEMP
and ENERGY STAR[reg]. For example, FEMP covers faucets, shower heads,
and urinals. Although water efficiency is not the primary focus of
ENERGY STAR[reg], it is also one of the factors that is considered in
rating the energy efficiency of such appliances as washing machines or
dishwashers. To the extent that FEMP or ENERGY STAR[reg] standards
cover water efficient products, they are covered by the proposed FAR
clause. If there is a need to expand the focus on water efficiency, it
needs to be achieved through expansion of the coverage of water
efficient products by ENERGY STAR[reg] or FEMP.
10. Other changes to the proposed rule.
``Energy-efficient product'' is already defined in FAR
Part 2, and within that definition, are the descriptions of ENERGY
STAR[reg] and FEMP. Therefore, the proposed definition of ``FEMP-
designated product'' at FAR 23.201 and in the clause have been deleted,
and the restriction on the meaning of the term ``product'' has been
added to the definition of ``energy-efficient product'' in FAR Part 2.
This revised definition of ``energy-efficient product'' has been added
to the clause.
The website for FEMP has been updated, both in the text at
FAR 23.204 (now 23.203) and paragraph (d) of the clause.
The statutory cite has been added at 52.212-5(b)(26).
This is not a significant regulatory action and, therefore, is not
subject to review under Section 6(b) of Executive Order 12866,
Regulatory Planning and Review, dated September 30, 1993. The rule is
not a major rule under 5 U.S.C. 804.
B. Regulatory Flexibility Act
The Department of Defense, the General Services Administration, and
the National Aeronautics and Space Administration certify that this
final rule will not have a significant economic impact on a substantial
number of small entities within the meaning of the Regulatory
Flexibility Act, 5 U.S.C. 601, et seq., because it only emphasizes
existing requirements. Whereas the Councils recognize that the rule may
affect small entities performing contracts for those agencies that have
not fully implemented the program in service and construction
contracts, public comments did not indicate that the number of entities
affected, or the extent to which they will be affected, will be
significant. The rule may affect the types of products these businesses
use during contract performance. Assistance (including product listings
and recommendations) is available to all firms at the ENERGY STAR[reg]
and FEMP websites, http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www.energystar.gov/products and http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www1.eere.energy.gov/femp/procurement/eep_requirements.html
,
nt/eep_requirements.html
,
be as simple as purchasing ENERGY STAR[reg] or FEMP-designated products
when performing service and construction contracts. The final rule has
eliminated the one aspect of the proposed rule that was criticized in a
public comment as having a potentially adverse impact on small
businesses. No Initial or Final Regulatory Flexibility Analysis has,
therefore, been performed.
C. Paperwork Reduction Act
The Paperwork Reduction Act does not apply because the changes to
the FAR do not impose information collection requirements that require
the approval of the Office of Management and Budget under 44 U.S.C.
3501, et seq.
[[Page 65872]]
List of Subjects in 48 CFR Parts 2, 22, 23, 36, and 52
Government procurement.
Dated: November 16, 2007.
Al Matera,
Director, Office of Acquisition Policy.
0
Therefore, DoD, GSA, and NASA amend 48 CFR parts 2, 22, 23, 36, and 52
as set forth below:
0
1. The authority citation for 48 CFR parts 2, 22, 23, 36, and 52
continues to read as follows:
Authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 42
U.S.C. 2473(c).
PART 2--DEFINITIONS OF WORDS AND TERMS
0
2. Amend section 2.101 in paragraph (b)(2) by adding, in alphabetical
order the definition ``Building or work''; and revising the definition
``Energy-efficient product'' to read as follows:
2.101 Definitions.
* * * * *
(b) * * *
(2) * * *
Building or work means construction activity as distinguished from
manufacturing, furnishing of materials, or servicing and maintenance
work. The terms include, without limitation, buildings, structures, and
improvements of all types, such as bridges, dams, plants, highways,
parkways, streets, subways, tunnels, sewers, mains, power lines,
pumping stations, heavy generators, railways, airports, terminals,
docks, piers, wharves, ways, lighthouses, buoys, jetties, breakwaters,
levees, canals, dredging, shoring, rehabilitation and reactivation of
plants, scaffolding, drilling, blasting, excavating, clearing, and
landscaping. The manufacture or furnishing of materials, articles,
supplies, or equipment (whether or not a Federal or State agency
acquires title to such materials, articles, supplies, or equipment
during the course of the manufacture or furnishing, or owns the
materials from which they are manufactured or furnished) is not
``building'' or ``work'' within the meaning of this definition unless
conducted in connection with and at the site of such building or work
as is described in the foregoing sentence, or under the United States
Housing Act of 1937 and the Housing Act of 1949 in the construction or
development of the project.
* * * * *
Energy-efficient product-- (1) Means a product that--
(i) Meets Department of Energy and Environmental Protection Agency
criteria for use of the Energy Star trademark label; or
(ii) Is in the upper 25 percent of efficiency for all similar
products as designated by the Department of Energy's Federal Energy
Management Program.
(2) As used in this definition, the term ``product'' does not
include any energy-consuming product or system designed or procured for
combat or combat-related missions (42 U.S.C. 8259b).
* * * * *
PART 22--APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS
22.401 [Amended]
0
3. Amend section 22.401 by removing the definition ``Building or
work''.
PART 23--ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY
TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE
0
4. Amend section 23.201 by revising paragraph (b) to read as follows:
23.201 Authorities.
* * * * *
(b) National Energy Conservation Policy Act (42 U.S.C. 8253, 8259b,
8262g, and 8287).
* * * * *
0
5. Revise section 23.203 to read as follows:
23.203 Energy-efficient products.
(a) Unless exempt as provided at 23.204--
(1) When acquiring energy-consuming products listed in the ENERGY
STAR[reg] Program or Federal Energy Management Program (FEMP)--
(i) Agencies shall purchase ENERGY STAR[reg] or FEMP-designated
products; and
(ii) For products that consume power in a standby mode and are
listed on FEMP's Low Standby Power Devices product listing, agencies
shall--
(A) Purchase items which meet FEMP's standby power wattage
recommendation or document the reason for not purchasing such items; or
(B) If FEMP has listed a product without a corresponding wattage
recommendation, purchase items which use no more than one watt in their
standby power consuming mode. When it is impracticable to meet the one
watt requirement, agencies shall purchase items with the lowest standby
wattage practicable; and
(2) When contracting for services or construction that will include
the provision of energy-consuming products, agencies shall specify
products that comply with the applicable requirements in paragraph
(a)(1) of this section.
(b) Information is available via the Internet about--
(1) ENERGY STAR[reg] at http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www.energystar.gov/products; and (2) FEMP at http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www1.eere.energy.gov/femp/procurement/eep_
rocurement/eep_
23.204 [Redesignated as 23.205]
0
6. Redesignate section 23.204 as new section 23.205.
0
7. Add new section 23.204 to read as follows:
23.204 Procurement exemptions.
An agency is not required to procure an ENERGY STAR[reg] or FEMP-
designated product if the head of the agency determines in writing
that--
(a) No ENERGY STAR[reg] or FEMP-designated product is reasonably
available that meets the functional requirements of the agency; or
(b) No ENERGY STAR[reg] or FEMP-designated product is cost
effective over the life of the product taking energy cost savings into
account.
0
8. Add new section 23.206 to read as follows:
23.206 Contract clause.
Unless exempt pursuant to 23.204, insert the clause at 52.223-15,
Energy Efficiency in Energy-Consuming Products, in solicitations and
contracts when energy-consuming products listed in the ENERGY STAR[reg]
Program or FEMP will be--
(a) Delivered;
(b) Acquired by the contractor for use in performing services at a
Federally-controlled facility;
(c) Furnished by the contractor for use by the Government; or
(d) Specified in the design of a building or work, or incorporated
during its construction, renovation, or maintenance.
PART 36--CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS
0
9. Amend section 36.601-3 by redesignating paragraph (a) as paragraph
(a)(1) and adding a new paragraph (a)(2) to read as follows:
36.601-3 Applicable contracting procedures.
(a)(1) * * *
[[Page 65873]]
(2) Facility design solicitations and contracts that include the
specification of energy-consuming products must comply with the
requirements at subpart 23.2.
* * * * *
PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES
0
10. Amend section 52.212-5 by revising the clause date to read ``(DEC
2007)''; redesignating paragraphs (b)(26) through (b)(38) as paragraphs
(b)(27) through (b)(39); and adding a new paragraph (b)(26) to read as
follows:
52.212-5 Contract Terms and Conditions Required to Implement Statutes
or Executive Orders--Commercial Items.
* * * * *
(b) * * *
(26) FAR 52.223-15, Energy Efficiency in Energy-Consuming
Products (DEC 2007) (42 U.S.C. 8259b).
* * * * *
0
11. Amend section 52.213-4 by revising the clause date to read ``(DEC
2007)''; redesignating paragraphs (b)(1)(viii) through (b)(1)(xi) as
paragraphs (b)(1)(ix) through (b)(1)(xii); and adding a new paragraph
(b)(1)(viii) to read as follows:
52.213-4 Terms and Conditions--Simplified Acquisitions (Other Than
Commercial Items).
* * * * *
(b) * * *
(1) * * *
(viii) 52.223-15, Energy Efficiency in Energy-Consuming Products
(DEC 2007) (42 U.S.C. 8259b) (Unless exempt pursuant to 23.204,
applies to contracts when energy-consuming products listed in the
ENERGY STAR[reg] Program or Federal Energy Management Program (FEMP)
will be--
(A) Delivered;
(B) Acquired by the Contractor for use in performing services at
a Federally-controlled facility;
(C) Furnished by the Contractor for use by the Government; or
(D) Specified in the design of a building or work, or
incorporated during its construction, renovation, or maintenance.)
* * * * *
0
12. Section 52.223-15 is added to read as follows:
52.223-15 Energy Efficiency in Energy-Consuming Products.
As prescribed in 23.206, insert the following clause:
ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (DEC 2007)
(a) Definition. As used in this clause--
Energy-efficient product-- (1) Means a product that--
(i) Meets Department of Energy and Environmental Protection
Agency criteria for use of the Energy Star trademark label; or
(ii) Is in the upper 25 percent of efficiency for all similar
products as designated by the Department of Energy's Federal Energy
Management Program.
(2) The term ``product'' does not include any energy-consuming
product or system designed or procured for combat or combat-related
missions (42 U.S.C. 8259b).
(b) The Contractor shall ensure that energy-consuming products
are energy efficient products (i.e., ENERGY STAR[reg] products or
FEMP-designated products) at the time of contract award, for
products that are--
(1) Delivered;
(2) Acquired by the Contractor for use in performing services at
a Federally-controlled facility;
(3) Furnished by the Contractor for use by the Government; or
(4) Specified in the design of a building or work, or
incorporated during its construction, renovation, or maintenance.
(c) The requirements of paragraph (b) apply to the Contractor
(including any subcontractor) unless--
(1) The energy-consuming product is not listed in the ENERGY
STAR[reg] Program or FEMP; or
(2) Otherwise approved in writing by the Contracting Officer.
(d) Information about these products is available for--
(1) ENERGY STAR[reg] at http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www.energystar.gov/products; and (2) FEMP at http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www1.eere.energy.gov/femp/procurement/eep_
rocurement/eep_
(End of clause)
[FR Doc. 07-5799 Filed 11-21-07; 8:45 am]
BILLING CODE 6820-EP-S