DFARS 214.201-5( c ) was recently added to read:

Include an evaluation factor regarding supply chain risk (see subpart 239.73) when acquiring information technology, whether as a service or as a supply, that is a covered system, is a part of a covered system, or is in support of a covered system, as defined in239.7301.

What's wrong with this picture?

Share this post


Link to post
Share on other sites

Is it the use of a non-price evaluation factor in a sealed bid? You quoted DFARS 214.201-5( c ), and Part 14 is sealed bidding.

Share this post


Link to post
Share on other sites

Don, do you think that FAR Provision 52.214-21, Descriptive Literature, could be the means for the agency requesting and evaluating the supply chain management plan (particularly paragraph (B )(5))?

Share this post


Link to post
Share on other sites

Don, do you think that FAR Provision 52.214-21, Descriptive Literature, could be the means for the agency requesting and evaluating the supply chain management plan (particularly paragraph (B )(5))?

No, I don't think a supply chain management plan would fall within "Methods of manufacture, assembly, construction, or operation" of a product.

I think that information necessary to assess a bidder's supply chain risk should be requested as part of a responsibility determination.