Jump to content

User 34

Members
  • Posts

    3
  • Joined

  • Last visited

Everything posted by User 34

  1. Whatever you do, spend time figuring out the structure first before implementing it and think deeply about what contracts should go in and what should not. Should a closed-out contract be subject to the new structure or not? If yes, how far back do you want to go? Do not spend time and effort designing a beautiful library only to toss the books in willy-nilly and then complain that you need a new library because the old one is disorganized.
  2. The title of the paper oversells the author's intent. It is much more grounded and recognizes the pitfalls of using AI in the way described. That is, if the underlying data is inaccurate or recorded non-uniformly, the AI will make the same mistake as a human, except it will be much faster. A more accurate title would be "Using AI to Streamline Responsibility Determinations Under FAR Part 9.1."
  3. BrettK, Although it does not appear to be an issue of "the length of time it took to finalize the contract made the actual goods no longer relevant to the original request," if you Google "GAO Hanford Waste Treatment Plant" you will find numerous GAO reports addressing technical changes and delays over the last 20 years. Just imagine what the technology was in 2000 compared to 2022. GAO-20-363, page 29 of 53: https://www.gao.gov/assets/gao-20-363.pdf
×
×
  • Create New...