Jump to content
The Wifcon Forums and Blogs

pwg5016

Members
  • Content Count

    2
  • Joined

  • Last visited

Community Reputation

0 Neutral

About pwg5016

  • Rank
    New
  1. Thank you Vern for the prompt response. I certainly understand that there are no shortcuts or special rules because of wanting to include open market items. This situation is somewhat odd, being that the high tech camera is on the GSA Schedule of the contractor, but the lenses required for the camera in accordance with the SOW are not on the GSA Schedule. At first, the proposed source listed all of the items in the requirement acdording to the source's part number, which initially gave the impression that all of the required items were under the GSA Contract. After a quick search through t
  2. TOPIC: Purchase Order under GSA FSS Contract: Open Market Items BACKGROUND: The primary item (camera) which has a cost of roughly $94,000 is exclusive to a particular manufacturer, and this is justified using a limited source justification. However, there are several items for this requirement not on the GSA FSS of the company which offers the camera. The total cost of these incidental items (lenses) is roughly $14,900.00. Initially it was thought that all the required items were on the GSA Schedule, which would have allowed for a sole GSA Contract Buy. However, after conducting additional res
×
×
  • Create New...